top of page

LIVE : Marsh Lane Bridge
Construction repairs and maintenance to a railway bridge in Bristol.

523f8072-81af-4e01-84b9-33f4f76aa2ce.jpg
6a2f1ded-8938-4c57-b9ef-ba1dfc98beaf.jpg
baf266c0-5816-4d50-a7ac-395b366462fc.jpg

Case Studies

Bauder Overlay, Sidmouth

Bauderflex warm-roof overlay system utilising tapered insulation, complete with insulated upstands and code 4 lead counter flashings. Bespoke Velux windows installed with custom lead detailing. 

Projects: Portfolio

01458785264

  • Instagram
  • LinkedIn

©2020 by Earthy Metal Developments.

bottom of page